Projects

  Project  Contractor / Client
Supreme Education Council,Sheraton hotel renovation,NECP,North Gate Mall,Katara, AL Jaber HQ,Barwa Commercial avenue- Type 3,4 &5 Alumco
Twin tower,Commercial tower,Hilton TreeNasser commercial towerAGR
White Square,TDOC,Qatar universityEGYBEL
Kinder garten SchoolJAFCO
Lusail Tower,Qatar Foundation,Rumaillah, Business parkAlumana
Mulipurpose hall Actor Al Saad, Al BarahaJersey
Doha Mall,Burj Marina, Doha Bank, WTC, The GateAlunasa
St. Rejis Hotel ,20 Schools, AQFSpecialized Aluminium
Ali Fteias Tower,IIB,HMCAluminium Gulf Ray

GALCO Projects

  • Jigging The transferred materials are opened (unbundled) and checked by the Jiggers for damages and for determining the type of cleaning requirement. Read

  • Pre Treatment
    Stage 1- Alkaline Etch (AD De Greaser/Etcher –Alkaline Medium) The Degreaser/Etcher removes the Rust, dirt, oil etc on the sections Read

  • Powder Coating is applied automatically with automatic guns and the operator provides manual touch up (Optional) if required at Faraday cage areas and or on complex sections Read

  • Curing The powder coating oven will be set so as to achieve a temperature of 200 degrees on the metal for 10 minutes. The Powder Coated Loads passes through Read

  • Off loading After curing, the Loads are offloaded by Offloading personnel and transferred from the conveyor to the unloading Jacks. Read

  • Online QC Checking QCI checks the loads for conformation to quality standards. And records the values in Online Quality Inspection Report GALCO-QC/03 and in Online Quality Read