GALCO Projects

  • Jigging The transferred materials are opened (unbundled) and checked by the Jiggers for damages and for determining the type of cleaning requirement. Read

  • Pre Treatment
    Stage 1- Alkaline Etch (AD De Greaser/Etcher –Alkaline Medium) The Degreaser/Etcher removes the Rust, dirt, oil etc on the sections Read

  • Powder Coating is applied automatically with automatic guns and the operator provides manual touch up (Optional) if required at Faraday cage areas and or on complex sections Read

  • Curing The powder coating oven will be set so as to achieve a temperature of 200 degrees on the metal for 10 minutes. The Powder Coated Loads passes through Read

  • Off loading After curing, the Loads are offloaded by Offloading personnel and transferred from the conveyor to the unloading Jacks. Read

  • Online QC Checking QCI checks the loads for conformation to quality standards. And records the values in Online Quality Inspection Report GALCO-QC/03 and in Online Quality Read